Concept

Precision — where it appears

One over the variance of an estimate, which is what a design maximises and what a fixed-width requirement states directly. Stating a requirement in it rather than in a sample size is what makes a fixed-width procedure possible and what makes its length a random variable.

Named by 6 essays across 5 fields — each of them below, with the objects they name alongside it.

No block size is best at both things the procedure claims. Two claims and one dial. The honest interval's half-width falls as the blocks get smaller, because the interval's degrees of freedom are the number of blocks: 0.2602 at blocks of two against 0.2933 at blocks of sixteen. The fixed-width claim — that the mean is within 0.25 of the truth — gets more reliable as they get larger, because the sample size is less variable: 92.40% against 95.00%. Both are computed from the same runs, and the second is reproduced to within a tenth of a point by E[2Φ(d√N/σ) − 1], which needs the sample-size distribution and nothing else. The schedules sit at the bottom left: as narrow as the smallest fixed block and as few observations, with the rule's spread estimate on half as many degrees of freedom again.

Two degrees of freedom, one total

The block size is a dial, and the two things a fixed-width procedure claims move in opposite directions along it. Divide the width by the square root of the sample size and one of them turns out to depend on the number of blocks and on nothing else.

pace · Width
What each instrument costs to read. The number of draws each instrument needs to separate a rectangular block from a trapezoidal one at two standard errors, at a block length of 20 and 120 rows — measured from each instrument's own spread on the same draws. The implied variance needs 7.0 and the 95% point needs 20.2, a factor of 2.90 at this block length. There is a closed form beside it and it does not depend on either the scale or the size of the gap: the standard error of a p-quantile is √(p(1−p))/f(q) over √B where a standard deviation's is σ/√(2B), which at the 95% point of a nearly normal reference distribution is 3.30 times as many draws for the same statement. And the quantile route needs every one of those draws resampled, where the variance route needs none.

Measuring a variance rather than a quantile

A resample's implied long-run variance can be computed from the sample with no resampling in it at all. A critical value cannot, and the difference is a factor of three in the draws before any of the resampling is counted.

crossing · Bootstrap
One rule keeps its promise and the other keeps its budget. Both stopping rules at five requirements, 1,500 experiments each, with a first stage of 5. The upper curve is the two-stage rule: 97.1%, 96.2%, 95.9%, 96.1%, 96.0% — at or above 95% at every point, which is a theorem rather than a tendency, because its interval is built from a spread estimated before the stopping point was chosen. It pays 2.06×, 2.01×, 2.00×, 1.99×, 1.99× the observations that knowing σ would need. The lower curve is the rule that re-estimates after every observation: 94.5%, 89.3%, 91.0%, 91.5%, 94.3%, on 0.98×, 0.87×, 0.88×, 0.93×, 0.96×. The second rule is the one anybody would run and the first is the one whose claim is true.

Stopping when it is precise enough

An experiment that runs until its estimate is precise enough is the natural design and the one with a theorem against it. Its two-stage cousin keeps its promise exactly, for every unknown spread, and pays twice the observations for it.

guarantee · Stopping
The overshoot is the last block size and nothing else. A run stops at a multiple of its own block sizes and cannot land between them, so it ends past its own target by about half a block. Fixed sizes overshoot by 1.5, 2.2, 3.1, 4.7, 8.5 observations as the size goes 2, 3, 5, 8, 16. Every schedule here ends in blocks of two and every one of them lands where blocks of two land — 1.62, 1.32, 1.37 against 1.48 — while having spent most of the run inside blocks four and eight times larger. That is the one thing on this page a schedule genuinely takes from both ends.

What a schedule actually buys

Big blocks early and small blocks late is the right instinct and it does not take both ends of the trade, because there are not two ends to take. What it does take is the overshoot — about four per cent of the observations — and a steadier stopping point.

pace · Nuisance
Two structures in three are made worse. What adjusting for every covariate measured does to the bias in the treatment's estimated effect, against adjusting for none, over 4000 randomly drawn structures of 6 covariates each. Each covariate is independently a common cause with probability 0.25, a cause of the treatment only, a cause of the outcome only, a cause of neither, a step on the causal path, or a common effect. The rule leaves a larger bias on 65.5% of structures, a smaller one on 33.8%, and the same on 0.7%. The share is a property of that population of structures rather than of adjustment, which is why the weights are stated; what does not depend on them is that the rule has no direction — it is not a conservative default that occasionally overcorrects, it is a rule whose error is whatever the structure happens to be.

Adjusting for everything

"Control for every covariate that was measured" leaves a larger bias than controlling for nothing on 65.5% of four thousand randomly drawn structures and a smaller one on 33.8%. Its squared error is 4.110 times that of using no covariate at all, and half of it sits in its worst tenth of structures.

collider · Conditioning
Two groups, a baseline and a follow-up, and nothing happening in between — baseline reliability 0.6. 600 units in two pre-existing groups whose true means are 1.00 apart, read once at baseline and once at follow-up, with no change for anybody. The two groups' mean changes are −0.075 and −0.032, so the change-score analysis reports a group difference of 0.043. The regression of follow-up on baseline and group reports 0.409, against a closed form of (1 − λ) × 1.00 = 0.400: at any one baseline reading the two groups' lines sit that far apart, because each group's units regress towards their own group's mean. The pooled slope in this sample is 0.614, the baseline's reliability.

Two analyses of one baseline

Two groups read at baseline and again at follow-up, with no change for anybody. Subtracting the baseline reports a group difference of −0.0014 and adjusting for it reports 0.4008 — and each analysis is exactly right about one reason the groups started apart and wrong by 0.40 about the other.

paradox · Rtm

Named alongside it

The objects these essays reach for when they reach for this one.

Monte CarloCoverageFixed-width intervalSample sizeSequential designStopping ruleVarianceBlockingClosed formConfoundingCovariate adjustmentDegrees of freedom

All concepts