Forecast interval — where it appears
Named by 7 essays across 4 fields — each of them below, with the objects they name alongside it.
What the model says next
The usual account of a time series stops at estimation. A forecast asks the other question — not what the parameter is but what the next observation will be — and the band round it is a closed form that grows with the horizon and then stops growing, at a value the series was going to reach anyway.
Coverage from exchangeability alone
A conformal interval's coverage is a fact about the ranks of m+1 numbers, so it can be enumerated before any data arrive — all 40,320 orderings of eight values, agreeing with the closed form to machine precision. What that exactness delivers is not 95%.
The interval that forgets it estimated
The forecast band is derived for a model whose parameters are known, and then computed by putting estimates into it. Counted, the 95% interval covers 87.3% six steps ahead on twenty-five observations, and the point forecast inside it returns to the mean a third faster than the series does.
The interval after the choice
Estimating the coefficients of a known model costs a 95% forecast interval about two points of coverage. Choosing which coefficients to estimate, from the same forty observations, costs another four and a half — so the step nobody records in the output is the more expensive of the two.
The repair that moves the wrong number
Correcting the bias in a persistence parameter is one line of arithmetic that works. Feeding the corrected estimate into a forecast repairs the number everybody looks at, makes the forecast worse by squared error at moderate persistence, and improves the interval for a reason that has nothing to do with bias.
What the interval is short by
The forecast interval covers 88.42% where it claims 95%. Correcting the persistence recovers 2.66 points, correcting the innovation variance 0.56, propagating the persistence's own standard error 0.40 — and all three together recover 4.20 of the 6.58, leaving a residual none of the standard repairs reaches.
The run that confirms it
The setting a response-surface analysis recommends was chosen because the fitted surface was highest there, so the height the fit predicts at it is a maximum over a random field. At twice the noise the fit predicts 0.858 more than is there — 0.72 of the prediction's own standard error — and the gap is not noise, it is the selection.
Named alongside it
The objects these essays reach for when they reach for this one.
Monte CarloCoverageForecast horizonParameter uncertaintyPlug in estimateStationarityForecast errorLeast squaresMean squared errorBenchmark forecastBias correctionDelta method