A standard error for a model that is wrong
What a wrong model estimates
A straight line fitted to a curved truth converges on the tangent at its own design's mean. Two honest studies of one world, fitting the same wrong model, report 2.600000 and 1.600000, and neither is in error.
The bread and the filling
The robust standard error is not a safety margin. At one setting of the error variance it is 1.2806 times the model-based one and at another it is 0.8246 times it, and the sign of a single dial decides which.
Robust is not free
A robust standard error's promise is asymptotic and its use is not. Its 95% interval covers 88.73% at twenty rows, and under mild heteroskedasticity it is the worse of the two intervals until a hundred.
Three corrections and a leverage
On an even design of twenty rows the four robust corrections read 0.8603, 0.9559, 1.0000 and 1.1647 of the truth and the choice barely matters. Add one point at x = 8 and they read 0.3191, 0.3419, 1.0000 and 5.1127.
Right for the wrong reason
A robust standard error costs no coverage where the risk is absent — 95.52% against 95.06% at twenty rows. It costs a 6.89% wider interval and a variance estimate 2.572 times as variable, and the pre-test that would avoid paying recovers 15.9% of what the insurance is worth.
The count that is not the rows
Three hundred rows in five clusters of sixty carry 6.9000 times the variance an independent-rows calculation reports, and the interval that counts rows covers 53.42%. The same five unequal sizes laid out two ways give design effects of 9.3158 and 5.4652.
The reference the sandwich is read against
The cluster-robust interval covers 75.05% at five clusters and 93.58% at eighty. The same estimate read against a t on G − 2 covers 87.95% at five, and the estimator is unchanged — three hundred rows grouped into five clusters cover 74.28% where the same three hundred grouped into seventy-five cover 94.63%.