Past the first term of the normal approximation
A bound written for a coin
The Berry–Esseen theorem guarantees how far a standardised sum can be from the normal, and the guarantee is true. On an exponential source it is 8.62 times the real worst error at every sample size, the worst error sits at the centre rather than in a tail, and at a hundred draws the bound is larger than the 2.5% tail it would be asked to vouch for.
A correction that goes below zero
One Edgeworth term takes the normal approximation's error at two standard deviations from 38% to 8% on ten exponential draws, and stretches the range within 10% of the truth from 1.66 to 3.09 standard deviations at a hundred. It also turns negative in the short tail at every sample size — past 3.13 standard deviations at a hundred draws and 9.83 at a hundred thousand — because the region recedes only as the sixth root of n.
An approximation built at the threshold
The saddlepoint approximation reads the tail of a sum of five exponential draws to within 0.19% six standard deviations out, where the normal is short by a factor of more than sixty thousand. It is within 2.2% out to ten standard deviations on a single draw, where there is nothing to average, and within 1.1% on a binomial whose expected count is one. It works because it is built where the tail is read rather than at the mean.
A tail the sample never saw
Given the source, the saddlepoint reads the tail of a sum of thirty exponential draws to within a fifth of a per cent six standard deviations out. Given only a sample of thirty from that source, the same tilt reads it at a median of 0.061 of the truth, and nine samples in ten read it low. The error has moved from the approximation to the sample: thirty draws put the skewness at a median of 1.30 against a true 2, and hold nothing past their largest value.
The same correction, inverted
One skewness term added to a tail probability keeps a sum of a hundred exponential draws within 10% of the truth out to 3.09 standard deviations. The same term used to move the critical value instead keeps the test's actual size within 10% of nominal out to 5.10 — a level of about one in six million. In the short tail it has a flaw of its own: below a level of about one in a million at ten draws the corrected critical value turns back, and a test asked for a level of 10⁻⁷ rejects 1,149 times too often.
The correction a t test would use
On thirty exponential draws the one skewness term that held a sum's critical value within 10% out to five standard deviations nearly triples a t test's 1% size when the source's skewness is known, and its upper critical value turns back — at a level of 0.89% on ten draws, where a test asked for one in a thousand rejects 121 times too often. Hall's monotone cubic removes the turn and gains a floor. Built from the sample's own skewness it holds the short side within 20% from 10% down to one in a hundred thousand, and leaves the long side, the one a safety limit reads, at twice its level: the samples that fail are the ones that hide their skewness.
A tilt for the ratio
A t statistic is a function of two means, so its saddlepoint tilts the joint law of each draw and its square. On an exponential source every such tilt is a truncated normal, and none has a coefficient of variation above one — the exponential is the edge of its own family. Integrated over the samples a tilt can reach, the saddlepoint reads a t statistic's tails on thirty draws within 2.5% from 10% to one in a million on the long side, with nothing fitted. The samples it cannot reach are a third of all samples, they sit at the centre of the statistic rather than in its tails, and a larger sample has more of them.