Field

A promise about two arms

The fixed-width interval whose coverage is exact was built for one mean, and almost nothing anybody runs an experiment for is one mean. The construction survives with the harmonic effective size in place of the block size, and four things do not: a unit of that size costs four observations rather than one, the second variance puts Neyman's allocation in reach of a blinded rule, the conservation identity comes up one degree of freedom per block short, and there is an exact estimator under either of two conditions and none under both.

All essays