Trace statistic — where it appears
Named by 3 essays across one field — each of them below, with the objects they name alongside it.
Counting what is still wandering
The statistic that turns a spectrum into an integer has one name and three distributions. Its 5% point is 8.12, 18.64 or 31.74 depending only on how many series are left wandering under the null being tested — and read against the wrong one of those three, it calls unrelated random walks cointegrated most of the time.
The rank is a decision
The sequential procedure's 5% bounds one of its two errors. Over-counting reads between 4.2% and 7.2% at every sample length from fifty observations to three hundred; under-counting reads 69.5% at fifty and 0.0% at three hundred, and nothing in the procedure bounds it.
Which mistake about the rank costs
On a system with two relations, imposing none costs 29.2% of squared forecast error and imposing three costs 2.5%. The expensive mistake is under-counting, which is the error the procedure's 5% does not bound — so the guarantee protects the cheap side.
Named alongside it
The objects these essays reach for when they reach for this one.
Cointegrating rankCommon trendRandom walkReduced-rank regressionCointegrationCritical valueDifferencingEigenvalueError rateMonte CarloConvergence rateThe error-correction model