Sandwich estimator — where it appears
Named by 4 essays across one field — each of them below, with the objects they name alongside it.
The bread and the filling
The robust standard error is not a safety margin. At one setting of the error variance it is 1.2806 times the model-based one and at another it is 0.8246 times it, and the sign of a single dial decides which.
Three corrections and a leverage
On an even design of twenty rows the four robust corrections read 0.8603, 0.9559, 1.0000 and 1.1647 of the truth and the choice barely matters. Add one point at x = 8 and they read 0.3191, 0.3419, 1.0000 and 5.1127.
The count that is not the rows
Three hundred rows in five clusters of sixty carry 6.9000 times the variance an independent-rows calculation reports, and the interval that counts rows covers 53.42%. The same five unequal sizes laid out two ways give design effects of 9.3158 and 5.4652.
The reference the sandwich is read against
The cluster-robust interval covers 75.05% at five clusters and 93.58% at eighty. The same estimate read against a t on G − 2 covers 87.95% at five, and the estimator is unchanged — three hundred rows grouped into five clusters cover 74.28% where the same three hundred grouped into seventy-five cover 94.63%.
Named alongside it
The objects these essays reach for when they reach for this one.
Degrees of freedomEstimated varianceLeverageMonte CarloClosed formCluster-robust standard errorCluster sizeClustered samplingCoverageDesign effectFinite-sample correctionHeteroskedasticity-consistent